We are back in the house!!!!!!!!
we moved back in on Saturday and we have been very busy.
Still alot to organize and some painting to do on the rest of the house--
also still have to get a mirror for the bathroom!
we are all loving being back home!!! :)
Tuesday, October 9, 2012
Wednesday, October 3, 2012
131 Update- Tuesday
The plumber was back out to install the faucets, toilet, dishwasher, ran line to fridge and turned the water back on!
Fans are up (although they put the wrong color blades down) so they will fix that today.
Microwave and dishwasher are in place.
Painter will be there today- probably finish tomorrow.
Electrician will be out today to fix that fixture and outlet in the bath.
After the paint is done they will move the rest of the appliances back in.
The cabinet company will be back out I think tomorrow to do a final setting to make sure all drawers and doors are opening and closing as they should.
PICTURES:
Looking good-- although lots of small things still to be done-
Don't worry I have my excel spreadsheet started with all the items that WILL be complete before we sign off! :)
Have a good day.
Fans are up (although they put the wrong color blades down) so they will fix that today.
Microwave and dishwasher are in place.
Painter will be there today- probably finish tomorrow.
Electrician will be out today to fix that fixture and outlet in the bath.
After the paint is done they will move the rest of the appliances back in.
The cabinet company will be back out I think tomorrow to do a final setting to make sure all drawers and doors are opening and closing as they should.
PICTURES:
Looking good-- although lots of small things still to be done-
Don't worry I have my excel spreadsheet started with all the items that WILL be complete before we sign off! :)
Have a good day.
Monday, October 1, 2012
131 Update
Last week there was not alot going on at the house until Friday.
Friday- they came back to finish the tile in the bathroom-- just have to put the grout (not sure that is what you put in between the tiles when it is on the shower walls or not).
We found that the electrician has to come back out to fix the position of the bathroom outlet and light fixture. Our original plan had the vanity extending down towards the door further- but then we changed it and he placed the fixture based on the old plans.... so that sucks but shouldn't be too much to fix.
Then just as we went to the house Friday evening to check on everything- the granite guys were pulling up to drop off the kitchen counter tops!!!!! :) They installed them in about 25-30 min. It was amazing.
We LOVE them!
They are still saying they will be done this week! :)
Things to get done still:
Bring in appliances
Paint (they primed but need to do the top coat)
Trim
Bathroom- Vanity Top, Fix fixture, install shower & sink faucet
Fix Living Room Fan (only 2 speeds are working)
Remove 1 of the light switches in Kitchen/patch it and paint
CLEAN CLEAN CLEAN!!!!
We will have to have our carpet cleaned very well to get all the dry wall dust and such removed.
However I feel like an end is in sight and I can not wait to get back home!!!!
I miss sleeping in my bed with my husband! :)
Plus, I feel the need to get home to pack our bags for the hospital for this little one's arrival.... can you believe it is Week 35?!! :)
Friday- they came back to finish the tile in the bathroom-- just have to put the grout (not sure that is what you put in between the tiles when it is on the shower walls or not).
We found that the electrician has to come back out to fix the position of the bathroom outlet and light fixture. Our original plan had the vanity extending down towards the door further- but then we changed it and he placed the fixture based on the old plans.... so that sucks but shouldn't be too much to fix.
Then just as we went to the house Friday evening to check on everything- the granite guys were pulling up to drop off the kitchen counter tops!!!!! :) They installed them in about 25-30 min. It was amazing.
We LOVE them!
They are still saying they will be done this week! :)
Things to get done still:
Bring in appliances
Paint (they primed but need to do the top coat)
Trim
Bathroom- Vanity Top, Fix fixture, install shower & sink faucet
Fix Living Room Fan (only 2 speeds are working)
Remove 1 of the light switches in Kitchen/patch it and paint
CLEAN CLEAN CLEAN!!!!
We will have to have our carpet cleaned very well to get all the dry wall dust and such removed.
However I feel like an end is in sight and I can not wait to get back home!!!!
I miss sleeping in my bed with my husband! :)
Plus, I feel the need to get home to pack our bags for the hospital for this little one's arrival.... can you believe it is Week 35?!! :)