Monday, October 1, 2012

131 Update

Last week there was not alot going on at the house until Friday.

Friday- they came back to finish the tile in the bathroom-- just have to put the grout (not sure that is what you put in between the tiles when it is on the shower walls or not).



We found that the electrician has to come back out to fix the position of the bathroom outlet and light fixture.  Our original plan had the vanity extending down towards the door further- but then we changed it and he placed the fixture based on the old plans.... so that sucks but shouldn't be too much to fix.

Then just as we went to the house Friday evening to check on everything- the granite guys were pulling up to drop off the kitchen counter tops!!!!! :) They installed them in about 25-30 min.  It was amazing. 
We LOVE them!




They are still saying they will be done this week! :)

Things to get done still:
Bring in appliances
Paint (they primed but need to do the top coat)
Trim
Bathroom- Vanity Top, Fix fixture, install shower & sink faucet
Fix Living Room Fan (only 2 speeds are working)
Remove 1 of the light switches in Kitchen/patch it and paint

CLEAN CLEAN CLEAN!!!!
We will have to have our carpet cleaned very well to get all the dry wall dust and such removed.

However I feel like an end is in sight and I can not wait to get back home!!!!

I miss sleeping in my bed with my husband! :)

Plus, I feel the need to get home to pack our bags for the hospital for this little one's arrival.... can you believe it is Week 35?!! :)

1 comment: